The 961 Street

Oh, the long wait...!

Someone on linked in posted a pic of the new factory building, where the 650 production will be housed. Great news indeed (and I praised it too).

But... it’s an empty shell, not even got concrete floor yet. Still a long way from start of production I’d say (perhaps the posted pic was old though)?

Of course it’s better to sacrifice launch timing in order to protect quality, I just wish they’d get better at estimating timing. Even I could see there was NO WAY the estimate to be building Atlases in April was correct!

April 2020 maybe.
 
I wish they'd get it done, and get the 650's out the door already.
Soon they do that, the sooner they can start on the New Commando.
 
Back
Top