- Joined
- Nov 17, 2009
- Messages
- 127
Hello folks
It took a while to get my homepage reworked but now you should find some pics under "projects". The frames are more or less ready for assembly - they only need a couple of small parts added for the fitment of coils, seat, tank etc before they go to the platers. But first I need to find the time to make some tanks, seats etc ;-)
Most of the 905 engine is in the final stages, currently we make the mould for left crankcase half - will be much stronger and have an extra bearing for crank. The new oilpump drawings are ready so we will have made the first pump within a couple days. It has got 3-times the output, anti wetsump valve and oilpressure control - all of it integrated in the body. A new primary is almost ready and a 6speeder will be designed in the next few weeks. This gearbox will be shiftable left or right, 1st gear up or down.
Go to www.britishclassicbikes.de
Cheers
Hartmut
It took a while to get my homepage reworked but now you should find some pics under "projects". The frames are more or less ready for assembly - they only need a couple of small parts added for the fitment of coils, seat, tank etc before they go to the platers. But first I need to find the time to make some tanks, seats etc ;-)
Most of the 905 engine is in the final stages, currently we make the mould for left crankcase half - will be much stronger and have an extra bearing for crank. The new oilpump drawings are ready so we will have made the first pump within a couple days. It has got 3-times the output, anti wetsump valve and oilpressure control - all of it integrated in the body. A new primary is almost ready and a 6speeder will be designed in the next few weeks. This gearbox will be shiftable left or right, 1st gear up or down.
Go to www.britishclassicbikes.de
Cheers
Hartmut